Friday, July 19, 2013

Week 29

Two spotty half weeks previous. Some of the work from last week was recorded on Week 27 and the rest got canceled.  The guy loading the bar is a schmuck, and not only did he screw up the bench load for the second time in a row, but he also loaded a fifty pound jump instead of a ten pound jump when I was singling my pulls.

Pullup: 5,5,6 @ 18 assistance
Curls: 6, 6 @ 30's
Bench: 6 @ 115
Dead: 8 @ 190 , 1@ 225 some left
Press: 6 @ 85
Squat: 5 @190

 10x5x3x2x3x5x
Harness10    
Pullup 18   
Curls30's
   
Bench50557085105
Dead 100130160190
Press4545557085
Squat95100130160190

0 comments: